Tools Needed:
- Shovel(s)
- Tamp
- Rake
- Watering Hose
- Level (at least a 4’ level)
Materials Needed:
- Field Armor Panel (included)
- Five (5) 50lb bags of sand per panel (not included)
Ground crews installing Field Armor can use whatever they need to dig out the area where Field Armor is used. A small tiller works great for initial digging and shovels are then used to better shape the area. The area for a set of three panels requires digging out close to 100 square feet.
Please read all of these instructions before beginning the installation. Check to make sure that all of the carton contents are in the box. Get all tools necessary to finish the job together beforehand so everything will be at hand when installing. If you have questions about this installation process or you are missing any hardware, please call us.